MATERIAL
CN | Cable needle. |
DPN | Double pointed needle. |
ACTIONS
st | Stitches. |
K | Knit. |
P | Purl. |
dec | Decrease. |
inc | Increase. |
k2tog | Knit two stitches together. |
p2tog | Purl two together. |
k1 f&b (kfb) | Knit a stitch in the front and in the back (= increase of 1 stitch). |
p1 f&b (pfb) | Purl a stitch in the front and in the back (=increase of 1 stitch). |
M1 | Make 1, no method specified. |
M1L | Make 1 left. From the front, lift loop between stitches with left needle, knit into back of loop. (= increase of 1 stitch) |
M1R | Make 1 right. From the back, lift loop between stitches with left needle, knit into back of loop. (= increase of 1 stitch) |
yo | Yarn over; wrap the yarn around right needle. |
sl | Slip stitch. |
skpo | Slip 1, knit 1, pass slipped stitch over. |
Sk2p/Sp2p | Slip 1, k2tog/p2tog, pass slipped stitch over (=decrease of 2 stitches). |
psso | Pass slipped stitch over. |
pnso | Pass next stitch over. |
cross 2 L | Slip 2 stitches onto cable needle, keep cable needle in front of work, knit the next stitches, knit stitches off of cable needle. |
cross 2 R | Slip 2 stitches onto cable needle, keep cable needle in back of work, knit the next stitches, knit stitches off of cable needle. |
No comments:
Post a Comment